Expressions of Interest – Comparative Assessment of Raw Water Intake Options for the SWRO Plant located on Carriacou, GRENADA

Closing Date: March 27, 2018
 1182 Views



Details:

AIMS AND OBJECTIVES OF THE PROJECT AND THE CONSULTANCY

The aim of the project is to expand the system that has been installed so that potable water can be made available throughout the island of Carriacou. This will help to increase the island’s resilience to withstand periods of extended drought arising from Climate Change and support quick recovery in the aftermath of any natural disasters like hurricanes. The supply of potable water will contribute to the health and wellness of the island through a reduction in the likelihood of incidence of water borne diseases outbreaks.

The objectives of the project are to:
1.  Deliver potable water to over 4,000 people throughout the rural communities of Carriacou; and
2. Create/increase employment through economic opportunities and activities that will be generated from access to safe and reliable supply of water.

The objective of the consultancy is to:

Provide a technically sound solution for addressing the raw water intake problems at the Carriacou SWRO plant.

Back to top button