Design and Supervision: Buccament&Carriere/Ford River Defenses

Closing Date: August 22, 2017
 1323 Views



Details:

The overall objectives of the consultancy are to :

Lot 1: Buccament – Provide an updated assessment of the  hydrological / hydraulic conditions in the Vermont – Buccament catchment area and to develop a design for remedial works to ensure that the resulting system will provide long-term protection of public infrastructure from flooding and damage from the Buccament River;

Lot 2: Carriere/Ford – Using existing hydrologic studies, provide an embankment design for the Ford river at Carriere;

Provide construction supervision support to the Ministry of Economic Planning, Sustainable Development, Industry, Information and Labour (MoESIIL)during the implementation and construction of the approved interventions.

Back to top button