The overall objectives of the consultancy are to :
Lot 1: Buccament – Provide an updated assessment of the hydrological / hydraulic conditions in the Vermont – Buccament catchment area and to develop a design for remedial works to ensure that the resulting system will provide long-term protection of public infrastructure from flooding and damage from the Buccament River;
Lot 2: Carriere/Ford – Using existing hydrologic studies, provide an embankment design for the Ford river at Carriere;
Provide construction supervision support to the Ministry of Economic Planning, Sustainable Development, Industry, Information and Labour (MoESIIL)during the implementation and construction of the approved interventions.